After the cattle pass through the live cattle weighing system, they enter the cattle driving channel.
From the point of view of animal welfare and humaneness, cattle cannot be driven by violence. Violent driving will cause emergency response and affect the quality of beef. It is necessary to design a “lost” form to allow cattle to enter the slaughtering workshop consciously. The width of the driveway is generally designed to be 900-1000mm, and only one cow is allowed to pass along.
The height of the cattle drive should not be too low to prevent the cattle’s emergency response from jumping out of the cattle drive.
If you need to count the daily slaughter volume, you can use the counter to count in the cattle drive. The terminal of the cattle drive is connected to the cattle stunning box.
No. We are the original manufacturer of animal slaughtering lines, meat processing equipment, deboning and cutting system, spare parts, etc.
We have 3 slaughtering lines in our factory, including 1 cattle slaughtering line, 1 sheep slaughtering line and 1 pig slaughtering line. We also have deboning and cutting systems, hygiene tools, etc in our factory. You can also see the different design in our sample line room.
Normally, we will need 3 weeks for single machine, and 2 months for a whole production line. For confirmation, we will need to confirm with production director first. However, we will make your production lines as soon as possible.
We will need 30% of total contract value in advance by T/T as deposit. And the balance will be paid before your products are shipped out of factory.
We have our own inspection team in factory. They will inspect the raw material, semi-finished product, finished product following our drawing and standard in quotation sheet. You will get what you see during factory visit and you can check your products during the production anytime during the production.
Yes. We will send 1 engineer for overseas project guiding installation. As a buyer, you will need to pay for the round way air tickets, food and accommodation, local transportation in your project location, and also pay the allowance of the technician during installation.