The main framework is made of hot-dip galvanized I-beams, which are used to bear the weight of the chains, hooks and the carcasses of sheep, ensuring smooth operation and meeting food hygiene and anti-corrosion requirements. The carcass of the sheep is processed on this production line through procedures such as opening the anus, opening the chest, removing the white internal organs, removing the red internal organs, carcass inspection, and carcass trimming.
Vertical structure
1 set of drive unit; frequency converter speed regulation, hot-dip galvanized frame
1 set of pneumatic tensioning device; hot-dip galvanized frame, cylinder tensioning, automatic tensioning
N sets of rotating devices, hot-dip galvanized frame
N meters of hot-dip galvanized closed track, N meters of 40 chromium material conveying chain, equipped with indexing fingers, high molecular wear-resistant walking wheels
Stainless steel 40*40 double-track track, with track hangers
Approximately 3 meters of buffer track
Hot-dip galvanized fastening materials
Sighting distance of sheep: 1200mm
Drive unit is painted, pneumatic components are standard parts
Installed power: 3kw
No. We are the original manufacturer of animal slaughtering lines, meat processing equipment, deboning and cutting system, spare parts, etc.
We have 3 slaughtering lines in our factory, including 1 cattle slaughtering line, 1 sheep slaughtering line and 1 pig slaughtering line. We also have deboning and cutting systems, hygiene tools, etc in our factory. You can also see the different design in our sample line room.
Normally, we will need 3 weeks for single machine, and 2 months for a whole production line. For confirmation, we will need to confirm with production director first. However, we will make your production lines as soon as possible.
We will need 30% of total contract value in advance by T/T as deposit. And the balance will be paid before your products are shipped out of factory.
We have our own inspection team in factory. They will inspect the raw material, semi-finished product, finished product following our drawing and standard in quotation sheet. You will get what you see during factory visit and you can check your products during the production anytime during the production.
Yes. We will send 1 engineer for overseas project guiding installation. As a buyer, you will need to pay for the round way air tickets, food and accommodation, local transportation in your project location, and also pay the allowance of the technician during installation.