The Holding Pens is also slaughtering equipment that needs to be considered for medium and large slaughterhouses.
The Holding Pens shall be equipped with slaughtering pens (areas), observation pens for suspicious sick animals, isolation pens for sick animals, emergency slaughter rooms, and harmless treatment facilities; special transportation means that are closed and impermeable, easy to clean and disinfect; observation pens for suspicious sick animals. The location of the isolation circle for sick animals should not pose a risk of infection to healthy animals.
Different animals have different height requirements for slaughtering.
The size of the slaughtering pens should be calculated according to the daily slaughter volume.
Before slaughtering the cows, take a shower to wash off the dirt and microorganisms on the cow’s body. Control the water pressure during the shower, and don’t be too hasty to avoid excessive stress on the cow.
Before the cattle enter the cattle drive, they must be weighed and measured, so the live cattle weighing system generally needs to be configured in the slaughtering pen.
No. We are the original manufacturer of animal slaughtering lines, meat processing equipment, deboning and cutting system, spare parts, etc.
We have 3 slaughtering lines in our factory, including 1 cattle slaughtering line, 1 sheep slaughtering line and 1 pig slaughtering line. We also have deboning and cutting systems, hygiene tools, etc in our factory. You can also see the different design in our sample line room.
Normally, we will need 3 weeks for single machine, and 2 months for a whole production line. For confirmation, we will need to confirm with production director first. However, we will make your production lines as soon as possible.
We will need 30% of total contract value in advance by T/T as deposit. And the balance will be paid before your products are shipped out of factory.
We have our own inspection team in factory. They will inspect the raw material, semi-finished product, finished product following our drawing and standard in quotation sheet. You will get what you see during factory visit and you can check your products during the production anytime during the production.
Yes. We will send 1 engineer for overseas project guiding installation. As a buyer, you will need to pay for the round way air tickets, food and accommodation, local transportation in your project location, and also pay the allowance of the technician during installation.