The pig lifting machine is divided into a pipe rail elevator and a double rail elevator. The function of the elevator is to lift the slaughtered animals or carcasses onto the track for further processing. It is an essential slaughter equipment.
In the slaughtering process, there are two main use scenarios of pig lifting machines.
First usage scenario
Pig lifting elevator lifts the live animal to the track and waits for the assassination and bleeding. It is mainly used before bleeding. One end is connected with Pig Stunning Conveyor or Sheep Convey Machine, and the other end is connected with a bleeding line.
The second usage scenario
Lift the carcass to the track for further processing. It is mainly used to lift the carcass from the clean water tank or scraping platform to the carcass processing and slaughtering line after roughing pigs or sheep.
Hot-dip galvanized structure
The lifting height is generally 3M, which can be customized according to the site conditions
Chain: Hot galvanized chain plate, High strength, composite nylon material Idler wheel
Power: 1.5kw
Propagation speed 17 m / min
No. We are the original manufacturer of animal slaughtering lines, meat processing equipment, deboning and cutting system, spare parts, etc.
We have 3 slaughtering lines in our factory, including 1 cattle slaughtering line, 1 sheep slaughtering line and 1 pig slaughtering line. We also have deboning and cutting systems, hygiene tools, etc in our factory. You can also see the different design in our sample line room.
Normally, we will need 3 weeks for single machine, and 2 months for a whole production line. For confirmation, we will need to confirm with production director first. However, we will make your production lines as soon as possible.
We will need 30% of total contract value in advance by T/T as deposit. And the balance will be paid before your products are shipped out of factory.
We have our own inspection team in factory. They will inspect the raw material, semi-finished product, finished product following our drawing and standard in quotation sheet. You will get what you see during factory visit and you can check your products during the production anytime during the production.
Yes. We will send 1 engineer for overseas project guiding installation. As a buyer, you will need to pay for the round way air tickets, food and accommodation, local transportation in your project location, and also pay the allowance of the technician during installation.