The Live Pig Stunning Conveyor is mainly used to limit the activities of pigs and hang live pigs to the bleeding line smoothly. The speed and length can be customized according to the slaughter volume. Live Pig Stunning Conveyor needs to be used with the hoist.
It is mainly used in pig slaughterhouses, which can be operated by one person.
Power | 1.5kw |
Suit | for Pig Abattoir And Slaughterhouse |
Usage | Pig Conveying Before Killing |
Material | Hot Galvanized Steel |
Capacity | 50-100 Heads/Hour |
Weight | 1250kg(Customized) |
Dimension(L*W*H) | 5120*580*1600mm(Customized) |
Hot galvanized C-beam track
Nylon roller and hot-dip galvanized plate chain
High polymer wear-resistant walking wheel
φ60X4mm stainless steel tube rail(Tube rail)
Hot galvanized channel steel frame
Plate chain with push dog
40X40X2mm stainless steel double rail (double rail)
Driving and tension device
Low-pressure control switches
No. We are the original manufacturer of animal slaughtering lines, meat processing equipment, deboning and cutting system, spare parts, etc.
We have 3 slaughtering lines in our factory, including 1 cattle slaughtering line, 1 sheep slaughtering line and 1 pig slaughtering line. We also have deboning and cutting systems, hygiene tools, etc in our factory. You can also see the different design in our sample line room.
Normally, we will need 3 weeks for single machine, and 2 months for a whole production line. For confirmation, we will need to confirm with production director first. However, we will make your production lines as soon as possible.
We will need 30% of total contract value in advance by T/T as deposit. And the balance will be paid before your products are shipped out of factory.
We have our own inspection team in factory. They will inspect the raw material, semi-finished product, finished product following our drawing and standard in quotation sheet. You will get what you see during factory visit and you can check your products during the production anytime during the production.
Yes. We will send 1 engineer for overseas project guiding installation. As a buyer, you will need to pay for the round way air tickets, food and accommodation, local transportation in your project location, and also pay the allowance of the technician during installation.