Pre-dryer is suitable for processing carcasses hung on hooks. Loose bristles after dehairing may adhere to the carcass, and after singeing, they can easily leave marks on the carcass. The pre-dryer can remove loose bristles and moisture from the pig carcass, reducing the required processing time and thus lowering gas consumption.
Pre-dryer is suitable for processing carcasses hung on hooks. Loose bristles after dehairing may adhere to the carcass, and after singeing, they can easily leave marks on the carcass. The pre-dryer can remove loose bristles and moisture from the pig carcass, reducing the required processing time and thus lowering gas consumption.
Technical Specifications: The casing is made of stainless steel with a plate thickness of 1.5mm, and the frame is constructed from 50*50*2.5 square tubing. The machine is equipped with a stainless steel rotating drum fitted with flexible rubber flaps. The specially shaped flaps, combined with an appropriate drum rotation speed, ensure ideal drying results. The machine is equipped with three vertical stainless steel drums. Each drum is fitted with rubber flaps and is directly driven by an electric motor. The frame features a hot-dip galvanized structure, the casing is made of 1.5mm stainless steel plate, and the lower water collection tray is made of 1.52mm stainless steel plate.
Installed Power: 3 × 1.5kW
Overall Dimensions: 2400 × 1800 × 2100mm.
No. We are the original manufacturer of animal slaughtering lines, meat processing equipment, deboning and cutting system, spare parts, etc.
We have 3 slaughtering lines in our factory, including 1 cattle slaughtering line, 1 sheep slaughtering line and 1 pig slaughtering line. We also have deboning and cutting systems, hygiene tools, etc in our factory. You can also see the different design in our sample line room.
Normally, we will need 3 weeks for single machine, and 2 months for a whole production line. For confirmation, we will need to confirm with production director first. However, we will make your production lines as soon as possible.
We will need 30% of total contract value in advance by T/T as deposit. And the balance will be paid before your products are shipped out of factory.
We have our own inspection team in factory. They will inspect the raw material, semi-finished product, finished product following our drawing and standard in quotation sheet. You will get what you see during factory visit and you can check your products during the production anytime during the production.
Yes. We will send 1 engineer for overseas project guiding installation. As a buyer, you will need to pay for the round way air tickets, food and accommodation, local transportation in your project location, and also pay the allowance of the technician during installation.