The closed Scalding channel is used for soaking and scalding the hair of live pigs, reducing the process of personnel stirring and scalding the pigs. It is driven by a conveyor line.
The closed Scalding channel is used for soaking and scalding the hair of live pigs, reducing the process of personnel stirring and scalding the pigs. It is driven by a conveyor line.
The loop runs at the upper end of the scalding pool and lifts the scalded live pigs to a certain height within a certain period of time.
The pigs are dropped into the spiral depilation machine by the pneumatic pig drop device. Including :The inner tank of the pool is made of stainless steel plates
Made of 2.5mm thick, the shell is made of 1mm thick stainless steel plate, and the insulation layer is thick 100mm; Equipped with a stainless steel protective cover.
Dimensions: Length X1500X1400
No. We are the original manufacturer of animal slaughtering lines, meat processing equipment, deboning and cutting system, spare parts, etc.
We have 3 slaughtering lines in our factory, including 1 cattle slaughtering line, 1 sheep slaughtering line and 1 pig slaughtering line. We also have deboning and cutting systems, hygiene tools, etc in our factory. You can also see the different design in our sample line room.
Normally, we will need 3 weeks for single machine, and 2 months for a whole production line. For confirmation, we will need to confirm with production director first. However, we will make your production lines as soon as possible.
We will need 30% of total contract value in advance by T/T as deposit. And the balance will be paid before your products are shipped out of factory.
We have our own inspection team in factory. They will inspect the raw material, semi-finished product, finished product following our drawing and standard in quotation sheet. You will get what you see during factory visit and you can check your products during the production anytime during the production.
Yes. We will send 1 engineer for overseas project guiding installation. As a buyer, you will need to pay for the round way air tickets, food and accommodation, local transportation in your project location, and also pay the allowance of the technician during installation.