Scraping Conveyor

Scraping Conveyor

Scraping Conveyor

The work surface is made of stainless steel square tubes; below it are four adjustable height legs; the frame is made of □50×50×3 stainless steel square tubes; the conveying panel is made of □60×30×3 stainless steel square tubes; two parallel galvanized steel chains are equipped with stainless steel profiles, which are fully enclosed; 1 set of drive unit; 1 set of tensioning device; 4 sprockets with shafts and bearings; the connecting chains of two sets are made of galvanized material; the hook platform is driven by a gear motor, and the motor is equipped with a stainless steel protective cover;

Description

This equipment consists of: 

The work surface is made of stainless steel square tubes; below it are four adjustable height legs; the frame is made of □50×50×3 stainless steel square tubes; the conveying panel is made of □60×30×3 stainless steel square tubes; two parallel galvanized steel chains are equipped with stainless steel profiles, which are fully enclosed; 1 set of drive unit; 1 set of tensioning device; 4 sprockets with shafts and bearings; the connecting chains of two sets are made of galvanized material; the hook platform is driven by a gear motor, and the motor is equipped with a stainless steel protective cover; 

Overall dimensions: 5000×1550×800mm (length×width×height); Installation power: 1.5kw

Some common questions you need to know

  • Is ZBHT Machinery a trading company?

    No. We are the original manufacturer of animal slaughtering lines, meat processing equipment, deboning and cutting system, spare parts, etc.

  • What you can see in our factory?

    We have 3 slaughtering lines in our factory, including 1 cattle slaughtering line, 1 sheep slaughtering line and 1 pig slaughtering line. We also have deboning and cutting systems, hygiene tools, etc in our factory. You can also see the different design in our sample line room.

  • What is the lead time?

    Normally, we will need 3 weeks for single machine, and 2 months for a whole production line. For confirmation, we will need to confirm with production director first. However, we will make your production lines as soon as possible.

  • What is the payment procedures?

    We will need 30% of total contract value in advance by T/T as deposit. And the balance will be paid before your products are shipped out of factory.

  • How do we guarantee good quality?

    We have our own inspection team in factory. They will inspect the raw material, semi-finished product, finished product following our drawing and standard in quotation sheet. You will get what you see during factory visit and you can check your products during the production anytime during the production.

  • Is overseas installation available?

    Yes. We will send 1 engineer for overseas project guiding installation. As a buyer, you will need to pay for the round way air tickets, food and accommodation, local transportation in your project location, and also pay the allowance of the technician during installation.