Stainless Steel Double Rail Pulley are used to hang animals on rails, usually stainless steel. In the process of using, we not only have requirements on the material of slaughterhouse hook but also have very strict requirements on the bearing capacity.
For example, ordinary double-track pulley hooks cannot be used in cattle slaughterhouses because their load-bearing capacity cannot meet the load-bearing requirements.
The selection of stainless steel double rail pulley should pay attention to the following issues
1. Quantity
The number of pulley hooks is generally 1 or 1.2 times the daily slaughtering amount
2. Double-track meat track system, generally choose double-track pulley hook.
For pipe rails, pipe rail pulley hooks need to be selected
3. For pig and sheep slaughterhouses, we generally recommend choosing double-track slaughter hooks, and for cattle slaughterhouses choose pipe-track slaughter hooks. If there is both a sheep slaughtering line and a cattle slaughtering line, we recommend that the cattle slaughtering line can use a double-track slaughterhouse hook.
4. For large slaughterhouses, don’t forget to choose the pulley return system or Slaughter Hook Transporter when choosing the slaughter hooks.
No. We are the original manufacturer of animal slaughtering lines, meat processing equipment, deboning and cutting system, spare parts, etc.
We have 3 slaughtering lines in our factory, including 1 cattle slaughtering line, 1 sheep slaughtering line and 1 pig slaughtering line. We also have deboning and cutting systems, hygiene tools, etc in our factory. You can also see the different design in our sample line room.
Normally, we will need 3 weeks for single machine, and 2 months for a whole production line. For confirmation, we will need to confirm with production director first. However, we will make your production lines as soon as possible.
We will need 30% of total contract value in advance by T/T as deposit. And the balance will be paid before your products are shipped out of factory.
We have our own inspection team in factory. They will inspect the raw material, semi-finished product, finished product following our drawing and standard in quotation sheet. You will get what you see during factory visit and you can check your products during the production anytime during the production.
Yes. We will send 1 engineer for overseas project guiding installation. As a buyer, you will need to pay for the round way air tickets, food and accommodation, local transportation in your project location, and also pay the allowance of the technician during installation.