This is a 50 Cattle 200 Sheep Slaughtering Project for Mongolia, each shift calculated by 8 hours. Cattle and sheep slaughtering will be following the regulations of Mongolia.
Sheep slaughtering line adopts automatic bleeding line, manual pre-peeling line and carcass inspection conveyors. The sheep skin removing procedure will be done by arm type sheep skin removing machine. There is also goat dehairing machine to remove the sheep hair for barbeque usage. In the chilling room, sheep will be whole carcass.
Cattle slaughtering line adopts manual bleeding line with empty shackle returning line, manual carcass processing line and belt type offal and viscera removing machine. Cattle skin peeler is used for the removing of the cattle hide.

50C200S Project








No. We are the original manufacturer of animal slaughtering lines, meat processing equipment, deboning and cutting system, spare parts, etc.
We have 3 slaughtering lines in our factory, including 1 cattle slaughtering line, 1 sheep slaughtering line and 1 pig slaughtering line. We also have deboning and cutting systems, hygiene tools, etc in our factory. You can also see the different design in our sample line room.
Normally, we will need 3 weeks for single machine, and 2 months for a whole production line. For confirmation, we will need to confirm with production director first. However, we will make your production lines as soon as possible.
We will need 30% of total contract value in advance by T/T as deposit. And the balance will be paid before your products are shipped out of factory.
We have our own inspection team in factory. They will inspect the raw material, semi-finished product, finished product following our drawing and standard in quotation sheet. You will get what you see during factory visit and you can check your products during the production anytime during the production.
Yes. We will send 1 engineer for overseas project guiding installation. As a buyer, you will need to pay for the round way air tickets, food and accommodation, local transportation in your project location, and also pay the allowance of the technician during installation.