Half-split splash guard

Half-split splash guard

Half-split splash guard

The split anti-splash screen is installed at the split workstation. Its lower end is fixedly connected to the ground, and its upper end is connected to the carcass conveyor, forming a closed protective area. Its main function is to effectively prevent bone chips, bone dust, and blood from splashing during the splitting operation of pork, beef, etc., and to prevent pollutants from spreading to the surrounding areas, ensuring the environmental hygiene of the workshop and the safety of the operators. Screen size: 3500×1550mm (height×width)

Description

The split anti-splash screen is installed at the split workstation. Its lower end is fixedly connected to the ground, and its upper end is connected to the carcass conveyor, forming a closed protective area. Its main function is to effectively prevent bone chips, bone dust, and blood from splashing during the splitting operation of pork, beef, etc., and to prevent pollutants from spreading to the surrounding areas, ensuring the environmental hygiene of the workshop and the safety of the operators. Screen size: 3500×1550mm (height×width) 

Panel material: Made of 1.7 - 2.0mm thick stainless steel plate, it is sturdy, durable and easy to clean. 

Installation method: Use expansion bolts for fixing the splash-proof screen, and ensure reliable connection with the ground and the conveyor.

Some common questions you need to know

  • Is ZBHT Machinery a trading company?

    No. We are the original manufacturer of animal slaughtering lines, meat processing equipment, deboning and cutting system, spare parts, etc.

  • What you can see in our factory?

    We have 3 slaughtering lines in our factory, including 1 cattle slaughtering line, 1 sheep slaughtering line and 1 pig slaughtering line. We also have deboning and cutting systems, hygiene tools, etc in our factory. You can also see the different design in our sample line room.

  • What is the lead time?

    Normally, we will need 3 weeks for single machine, and 2 months for a whole production line. For confirmation, we will need to confirm with production director first. However, we will make your production lines as soon as possible.

  • What is the payment procedures?

    We will need 30% of total contract value in advance by T/T as deposit. And the balance will be paid before your products are shipped out of factory.

  • How do we guarantee good quality?

    We have our own inspection team in factory. They will inspect the raw material, semi-finished product, finished product following our drawing and standard in quotation sheet. You will get what you see during factory visit and you can check your products during the production anytime during the production.

  • Is overseas installation available?

    Yes. We will send 1 engineer for overseas project guiding installation. As a buyer, you will need to pay for the round way air tickets, food and accommodation, local transportation in your project location, and also pay the allowance of the technician during installation.